Produtos
- Equipamentos de controle de sólidos
- Triple Deck Shale Shaker
- Movimento linear xisto
- Aspirador desgaseificador
- Líquido de limpeza da lama
- Desander
- Desilter
- Decantando o centrifugador
- Sludge Vacuum Pump
- Vertical cortando secador
- Secagem de xisto
- Misturador de lama do jato
- Agitador da lama
- Bomba centrífuga
- Bomba da tesoura
- Bomba Slurry Submersível
- Injetor da lama
- Separador de gás de lama
- Dispositivo de ignição do fogo
- Bomba de parafuso
- Tanque de hidratação
- Tanque de lama
- Sala do centro de controle do motor
- Transportador helicoidal
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de controle de sólidos
- Peças de reposição
Contato
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Notícias da empresa
250GPM HDD Mud Recovery System Delivered To Customer
2021-01-21
On January 15, Brightway one set 250GPM HDD mud recovery system was officially delivered to a country in Southeast Asia.
The HDD mud recovery system is used to solve the mud treatment problem of the underground sewage pipe network project for the customer. According to the customer's construction site conditions, Brightway designed and customized this 250GPM HDD mud recovery system for customers. The system adopts the integrated double deck screen machine to meet the user's on-site mud treatment needs and reduce investment in other equipment, save construction cost. After operation, the capacity of system is up to 50-60 cubic meters per hour.
Brightway has worked with this customer many times, Customers have always recognized and trusted the mud treatment solutions and systems in the HDD drilling field of Brightway. At present, the system is expected to arrive at the customer's construction site at the end of next month for installation and operation.
Anterior :Delivery of 2 sets of Drilling Fluid Circulation System to customer