Produtos
- Equipamentos de controle de sólidos
- Triple Deck Shale Shaker
- Movimento linear xisto
- Aspirador desgaseificador
- Líquido de limpeza da lama
- Desander
- Desilter
- Decantando o centrifugador
- Sludge Vacuum Pump
- Vertical cortando secador
- Secagem de xisto
- Misturador de lama do jato
- Agitador da lama
- Bomba centrífuga
- Bomba da tesoura
- Bomba Slurry Submersível
- Injetor da lama
- Separador de gás de lama
- Dispositivo de ignição do fogo
- Bomba de parafuso
- Tanque de hidratação
- Tanque de lama
- Sala do centro de controle do motor
- Transportador helicoidal
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de controle de sólidos
- Peças de reposição
Contato
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
3000hp Drilling Rig Circulation System for 9000m U...
3000hp Drilling Rig Circulation System for 9000m Ultra Deep Drilling Proj...
-
2000hp Drilling Rig Mud Tank System for Saudi Arab...
2000hp Drilling Rig Mud Tank System for Saudi Arabia As earl...
Notícias da empresa
250GPM HDD Mud Recovery System Delivered To Customer
2021-01-21
On January 15, Brightway one set 250GPM HDD mud recovery system was officially delivered to a country in Southeast Asia.
The HDD mud recovery system is used to solve the mud treatment problem of the underground sewage pipe network project for the customer. According to the customer's construction site conditions, Brightway designed and customized this 250GPM HDD mud recovery system for customers. The system adopts the integrated double deck screen machine to meet the user's on-site mud treatment needs and reduce investment in other equipment, save construction cost. After operation, the capacity of system is up to 50-60 cubic meters per hour.
Brightway has worked with this customer many times, Customers have always recognized and trusted the mud treatment solutions and systems in the HDD drilling field of Brightway. At present, the system is expected to arrive at the customer's construction site at the end of next month for installation and operation.
Anterior :Delivery of 2 sets of Drilling Fluid Circulation System to customer