Produtos
- Equipamentos de controle de sólidos
- Triple Deck Shale Shaker
- Movimento linear xisto
- Aspirador desgaseificador
- Líquido de limpeza da lama
- Desander
- Desilter
- Decantando o centrifugador
- Sludge Vacuum Pump
- Vertical cortando secador
- Secagem de xisto
- Misturador de lama do jato
- Agitador da lama
- Bomba centrífuga
- Bomba da tesoura
- Bomba Slurry Submersível
- Injetor da lama
- Separador de gás de lama
- Dispositivo de ignição do fogo
- Bomba de parafuso
- Tanque de hidratação
- Tanque de lama
- Sala do centro de controle do motor
- Transportador helicoidal
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de controle de sólidos
- Peças de reposição
Contato
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
3000hp Drilling Rig Circulation System for 9000m U...
3000hp Drilling Rig Circulation System for 9000m Ultra Deep Drilling Proj...
-
2000hp Drilling Rig Mud Tank System for Saudi Arab...
2000hp Drilling Rig Mud Tank System for Saudi Arabia As earl...
Notícias da empresa
Integrated River Sludge Dewatering System Delivered to Customer
2021-05-26
On May 25th, a set of customized river sludge dewatering system was officially delivered to a foreign customer.
The client’s project is for river treatment, which needs to dehydrate the sludge deposited at the bottom of the river in many years. The project is located in a frigid region, where the muddy water is easy to freeze and difficult to deal with. According to the working conditions of the project and the requirements of the customer, Brightway customized this set of equipment for the customer. Brightway designed this complete set of three-stage separation sludge dewatering system. It is equipped with a mud heating device, two-stage screening device, dosing device, stacked screw dehydration device, etc. The designed processing capacity can reach 25m³ per hour. The advantage of this sludge dewatering system is that in any season work can be carried out outdoors without being affected by the air temperature. In addition, the integrated system does not require disassembly or installation. It is ready to use, convenient for transportation, and can be moved during construction, thus reducing the working time of the project and saving construction costs.
In the field of river dredging and river treatment, Brightway can provide customers with an integrated set of sludge dewatering equipment solutions, which can help customers solve the problem of on-site sludge dewatering treatment and help the environmental protection cause of river treatment. If you have this requirement, or are interested in our sludge dewatering program, please email us at brightway@brightwaysolids.com.
Anterior :Solids Vacuum Pump in Oilfield