Casa > Notícias

Contato

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Casos

Notícias

  • Brightway Showed in No.38 Booth of The 34th CSTT Exhibition 2016-10-11

    Today, The 34th CSTT Exhibition ( China international trenchless technology conference and exhibition ) opened grandly in the national agricultural library of the Beijing. Brightway Sales and Technical team showed in the No.38 Booth.   In the exhibition, ...

  • Brightway Invitation of the 34th CSTT Exhibition 2016-10-08

    On October 10-12, 2016. The 34th CSTT Exhibition ( China international trenchless technology conference and exhibition ) will be opened grandly in the national agricultural library of the Beijing. Brightway will show the new products in the No.38 Booth. This e...

  • Shipment of Mud Recovery System for Rotary Drilling Rig 2016-09-20

     After strict production,testing and commissioning, One set mud recovery system for rotary drill would be sent to destination of Malaysia customer.This mud recovery system will be used and matched with Rotary Drilling Rig. The capacity of system is 100 cu...

  • Precision Test of Decanter Centrifuge Drum 2016-09-08

    Centrifuge drum is the core components of the centrifuge. There are many small holes on the drum. Put the filter bag inside, Inside the filter bag packing materials, By motor through v-belt drive drum. After a high-speed, there create a strong centrifugal forc...

  • The Leaders of Sinopec Visited Brightway 2016-09-02

    On the morning of August 31, The Leaders of Sinopec the Leaders of Sinopec accompanied with WangYong, the Executive General Manager of Brightway,came to visit and exchange. This visit is annual work according to cooperation concept of learn and Win-win. Part o...

  • Mud Treatment Equipment Installation and Processing Technology in Pipe Jacking C... 2016-08-18

    Pipe jacking construction working principle: Pipe jacking construction is a construction method of underground pipeline developed after the shield construction. This construction method can not need to strata excavation. and It can cross roads, railways, river...

  • Shipment of 350GPM HDD Mud Recover System 2016-08-13

    Yesterday, One set 350GPM HDD Mud Recover System  has been sent to Shanghai Port of  China and would be transport to India. Brightway HDD Mud Recover System has great reputation in the market. And good comments...

  • After-Sales Service of ZJ50LDB Orbital Solids Control System 2016-08-03

    Yesterday, Brightway Service Team composed of four persons returned to company from Russia's Far East Oilfield after completing 15 days of After-Sales Service. They brought one service report about ZJ50LDB Orbital drilling mud solids control system back to Bri...

  • Drilling Waste Disposal System Sent to Shandong 2016-07-27

    Yesterday, After strict production and assembly, Brightway one set Drilling Waste Disposal System was sent to one oilfield of Shandong provice of China. Before this, Brightway invited the customer to visit brightway and inspect the equipment. and the customer ...

  • Good Reviews of High Speed Decanter Centrifuge in Russia 2016-07-19

    Recently, There was good news from the Far East Oilfield of Russia. Beacause of run stable and good mud treatment, Brightway BWLW365G High Speed Decanter Centrifuge, which is matching with ZJ50 LDB Solids Control System, got good reviews in Russia.   This...

Formulário de feedback

* Seu nome:
* Email:
* Empresa:
* Fax:
* Número de telefone:
* Mensagem: