Produtos
- Equipamentos de controle de sólidos
- Triple Deck Shale Shaker
- Movimento linear xisto
- Aspirador desgaseificador
- Líquido de limpeza da lama
- Desander
- Desilter
- Decantando o centrifugador
- Sludge Vacuum Pump
- Vertical cortando secador
- Secagem de xisto
- Misturador de lama do jato
- Agitador da lama
- Bomba centrífuga
- Bomba da tesoura
- Bomba Slurry Submersível
- Injetor da lama
- Separador de gás de lama
- Dispositivo de ignição do fogo
- Bomba de parafuso
- Tanque de hidratação
- Tanque de lama
- Sala do centro de controle do motor
- Transportador helicoidal
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema de controle de sólidos
- Peças de reposição
Contato
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casos
-
3000hp Drilling Rig Circulation System for 9000m U...
3000hp Drilling Rig Circulation System for 9000m Ultra Deep Drilling Proj...
-
2000hp Drilling Rig Mud Tank System for Saudi Arab...
2000hp Drilling Rig Mud Tank System for Saudi Arabia As earl...
Notícias da empresa
Jidong Oilfield Drilling Waste Disposal System Delivery
2020-06-16
Recently, Brightway produced drilling waste disposal system for Jidong Oilfield affiliated units. This equipment includes 2 sets of vertical cuttings dryer and 3 sets of decanter centrifuge. The final installation and commissioning work is currently in progress and is expected to be delivered to customers in the short term.
Most of the drilling projects in Jidong Oilfield are located near the offshore areas and shrimp ponds. In order to protect the ecological environment, Jidong Oilfield has been actively advocating and practicing green drilling, and adopted corresponding environmental protection measures for each well in the drilling construction. Among them, for the waste drilling fluid generated by drilling and waste mud treatment, the oil field has invested a batch of special treatment equipment, namely drilling waste disposal system. The equipment that Brightway produced for customers this time is an important cooperation that helps the environmental protection construction of Jidong Oilfield.
At present, the decanter centrifuge has been completed, and the drill cuttings dryer project has been completed 90%, Brightway workers are doing the final installation and commissioning work, it is expected to be sent to the oilfield drilling site by the end of this month. Know more about oilfield environmental protection equipment or to consult drilling waste disposal system, please click the link:http://www.brightwaysolids.com/Drilling-Waste-Management_d13